A change order is a formal amendment to the original construction contract that outlines modifications to the scope of work, contract price, or project timeline.
By plotting the earned value curves in the schedule versus what is actually happening, you can reflect on durations with levels of risk, over-optimism bias, and planning fallacy.
The future of construction scheduling is now. The future is a collaboration between different groups that are making it easier for the construction industry to collaborate.