Release Notes

Still have a question? Contact us.

  • Major new feature: Schedule Checklists
    • Customers now have the ability to create dynamic checklists that speed up the process of verifying schedule quality and completion rubrics for submittal to owners and government entities.
  • Should Start/Should Finish Report Improvements
  • New Custom Reporting Feature: Portrait & Landscape Page Orientation
    • When creating a new Custom Report, users can now toggle between Portrait and Landscape page orientations, automatically shifting content blocks into appropriate locations for each mode.
  • Bug Fixes
    • Fixed an issue that prevented some data from appearing in the exported Quality Report.
    • Fixed an issue affecting the performance of some dropdown UI elements.
    • Fixed an issue preventing the legend from appearing on the printed Summary Report.
    • Fixed a bug that prevented the Planned vs. Actual graph from rendering for some users.
    • Fixed an issue that prevented Gantt Cards from appearing as expected on Custom Reports.
  • Customizable Reporting
    • PROMOTE TO FULL FEATURE FROM BETA!
    • Add the Gantt Chart component option
    • Add Milestone Table component
    • Bug and error fixes
  • Schedule Quality
    • Add “Remaining Duration Increase” metric
  • Scheduling
    • Promote Phoenix .PPX file imports to full feature from BETA
    • Add PowerProject .PP file imports in BETA
    • Ensure the timestamp of the Data Date is considered when scheduling actually completed activity’s successors
    • Add proper Actual Dates where values are NULL in an XML file
    • Other import issue fixes
  • Subscriptions
    • Add Day of the Week delivery option
    • Add the ability to turn off delivery upon analysis complete
  • Bug Fixes
    • Restore the Critical Path indicator to SHS/SHF and Change reporting
    • Stabilize Revert and Reject Rule filtering
    • Stabilize the Procore integration
  • Redesign or Admin Pages
  • Add the ability to print and export grouping bars in the Should Have Started / Should Have Finished report
  • Add Brazil states on the Executive Dashboard Map
  • Add Model and Milestone information to Report file names
  • Add Activity ID information to the .MPP Circular Reference Error Message
  • Ensure models created after a Project is rebuilt utilize the setting specified in the Reconfigure Project Menu
  • Stop Inactive Projects from being counted in Company Dashboard info cards
  • Block the Procore integration from allowing multi-file type imports
  • Fix an issue causing an error when editing Company Metadata
  • Fix where Milestones were being counted as High Duration Activities in XML projects
  • Fix where the Calendar Lag setting was not importing correctly for XML projects
  • Fix an issue causing the loading indicator to persist on charts in the Executive Dashboard
  • Fix where the Narrative Report was using the wrong date for Compression
  • Fix an issue causing the Summary Schedule Report to bleed into the footer
  • Fix a scheduling issue involving Actual Start Dates are on the same day, but earlier than the Data Date
  • Backend enhancements and maintenance
  • Should Have Started / Should Have Finished Report
    • Add the ability to quickly filter by the donut chart slices
    • Add a Global Configuration to allow for slippage when determining whether activities are late
  • Add baseline information to Velocity Report
  • Add Executive Dashboard PDF report
  • Add a Global Configuration to lock in the end dates as presented in the baseline schedule for analysis
  • File Importing
    • Fix an issue causing MPP imports to fail due to Elapsed Durations
    • Add specific circular reference error for MPP imports
    • Update the PPX import process for partial second date formats
    • Fix where SmartPM would read Friday and Saturday as weekends in some XML files 
  • Skip the Track to Activities step in Project Create for Project Plans that do not include Activity Tracking
  • Fix an issue causing the Trend Graphs to scale incorrectly
  • Fix where users could not remove Metadata Filters on the Company Dashboard
  • Adjust the actual percent complete calculation to better account for activities with an actual start date with the same timestamp of a schedule update
  • Add Ability to Unsubscribe from Analysis Complete Emails

  • Add Ability to Subscribe to Automated Reports (beta)
  • Add Ability to Subscribe to Notifications (beta)
  • Add ability to group SHS/SHF report by activity code and WBS
  • System Stability Improvements
  • New and Improved Trends Report Print
  • Improve batch Change Log Flagging for large batches
  • Add “(.MPP Only)” to “Summary Bar Logic Ties” “Manually Scheduled Summary Tasks” “Manually Scheduled Activities” in the schedule quality editor
  • Fix an issue causing the scroll bar to disappear when Echo Notification appears
  • Fix an issue causing duplicate daily reports in the Delay Analysis
  • Fix an issue causing Project Create to fail after selecting a Contractual End Date before uploading the Baseline Schedule
  • Ensure the Procore integration does not ask to import previously excluded files
  • Reactivate the direct E-Mail button in reports
  • Add Trends print and export buttons back
  • If an activity does not have an assigned WBS, put it on top of the level one WBS when WBS grouping is turned on
  • Fix on the Executive Dashboard where pulling up the project list for an index that is hidden on company default (but not hidden on a project’s quality profile) causes a failure
  • Ensure the user can only create logic with activities from the selected schedule when building Change Conditions
  • Fix an issue causing an error while changing the Data Date with the Activity Details pane open
  • Fix an issue causing Remaining Durations to update incorrectly when there is not a timestamp in the native file
  • Add requirements to submitting a Historical Weather Report Request
  • Add Global Configuration to honor actual date changes in the SmartPM analysis
  • Add company logo placement option to all relevant SmartPM report templates
  • Add 2nd Generation Activity Storage configuration
  • Executive Dashboard enhancements & fixes
  • PPX integration enhancements & fixes
  • Trigger the “Analysis in Progress” note for all track-tos set to be updated immediately after a new update session
  • Fix where the Milestone Table would re-order upon rebuild under certain circumstances
  • Remove “Primary Model – Full Schedule” as a “Schedule quality display should be based on” Global Configuration option
  • Fix issue with start-to-start ties with lag in schedules using progress override 
  • Fix issue where historical Gantt chart data disappears when an unstarted activity is resequenced
  • Allow Re-Ordering of Milestone Table
  • Allow Key Milestone Table column customization
  • Add Schedule Quality Grade and Forecasted Completion to Milestone Table
  • Add support for setting Contractual End Date
  • Add support for latest version of MPP
  • Allow unstatused activities start/finish date to ignore the time component
  • Fix cache issue for flagging changes
  • Ignore Calendar Time Changes in Revert/Reject menu
  • Trend Chart notification clarification for analyses with one schedule
  • Update title for Should Started/Finished report
  • Fix Activity Code grouping in Gantt Chart
  • Fix quick search in Gantt Chart
  • Allow more characters when naming % Complete Customization.
  • Added Manpower Metrics Card to Project Workspace
  • Added Cost Metrics Card to Project Workspace
  • Add Trends Per Quality Metric
  • Added indicator for already tracked activities to Track Activity in Project Workspace
  • Add Rebaseline Indicator to Manage Schedules
  • Add support for generating Schedule Summary with Activity Code Description
  • Add auto logout notification to Admin Panel
  • Add Configuration for Allowed Days for Remaining Days Discrepancy
  • Improved handling of duplicate scenarios on rebuild
  • Improved validation feedback for quality editor
  • Improved handling of Milestones with Duration > 1 with Microsoft Project
  • Improved Company Dashboard Performance
  • Fix: Project Metadata Not Saving for New Projects
  • Fix: Creating Project via Procore
  • Fix: Rebaselining with no tracked activities
  • Scheduling Engine V2 available in Alpha
  • Global Settings available
  • Improved handling of simultaneous delay analyses
  • Dynamic High Float/Duration threshold based on remaining project duration
  • Limit activity duration to 20-years
  • Fix import update failure e-mails not going out
  • Add validation for missing base calendars
  • Fix summary bars in Gantt Chart population
  • Stability improvements
  • Global Scenario Configurations available (beta)
  • Scheduling Engine Enhancement: Scheduling Engine v2 to be selected at Scenario level
  • Scheduling Engine Enhancement: Set-up for support of Late Start and Finish Dates
  • Add support for “tabs” in XER fields
  • Remove “PIndex” from Gantt Chart left window
  • Improve stability when opening Project
  • Allow updating Scenario Name and Description from Update Scenario screen
  • Restore Delay Analysis Complete emails
  • Ability to run Delay Analysis with Calendars from specific windows (Beta)
  • Fix Compression figure not showing in the SmartPM Report when Compression = 0%
  • Increase character limit in the Scenario Description field to 5,000
  • Disable the processing of archived scenarios in the background