Press

SmartPM Showcasing Technology-Driven Innovation at ASCE 2021

SmartPM’s Michael Pink will be a panelist during the Innovation in Civil Engineering at ASCE 2021.

ATLANTA – Sept. 22, 2021 – SmartPM Technologies Inc.’s Founder and CEO, Michael Pink, will be a panelist during the Innovation in Civil Engineering discussion at the American Society of Civil Engineers (ASCE) 2021 Convention. The panel presentation will be held on Oct. 6 from 4:15 to 5:45 p.m.

Panelists include innovation industry and academic leaders, along with civil engineer entrepreneurs. This esteemed group of experts will gather at ASCE to discuss how strategy drives the capacity to innovate and share some of the challenges, strategies, and best practices that have contributed to their success as innovators, entrepreneurs, and intrapreneurs.

“I look forward to discussing the challenges I have seen in the commercial construction industry — including costly delays, overruns, and disputes — and the solutions,” said Pink, whose SmartPM product addresses these problems. “Technology is helping catapult the industry forward. The solutions of the future start with innovation.”

Panelists will also discuss why, despite substantial investments of time and money, many innovation initiatives have been short-lived or haven’t produced dramatic shifts in competitive position or sustained desired performance.

 

“SmartPM Technologies is an innovative disruptor in the construction industry,” Pink continued. “Critical path method scheduling has been a standard process in construction that hasn’t changed in 40 years. SmartPM is a tool that changes the game and provides instantaneous understanding about what’s happening with the performance of a construction project.” As a real-time automated analytics platform, SmartPM translates construction schedule data into objective, reliable and concise visuals all stakeholders can understand and utilize proactively to address critical project risk issues.

 

The panel’s moderator will be Paul F. Boulos, Ph.D, an award-winning engineering and technology executive. Pink will join panelists Bradford O. Russell, Director of Architecture and Engineering at BR Architects & Engineers; Benjamin Schmidt, Ph.D., Co-founder and CEO of RoadBotics; and Eric S. Sullivan, NASSCO PACP Trainer and Director of Business Development at SewerAI. Participants will learn the value of developing a strategy for innovation, best practices to build teams that can deliver it, and the know-how to implement innovation strategies and business models.

SmartPM Technologies serves businesses across the construction industry, including general contractors, owners and owners’ representatives, developers and builders, government entities, and some of the world’s largest and most prominent insurance and consulting firms. To date, over 25% of the ENR Top 55 contractors rely on SmartPM to improve their construction schedule management process.

The ASCE represents more than 150,000 members of the civil engineering profession in 177 countries.

 

About SmartPM Technologies

 

SmartPM Technologies Inc., a leading project analytics company for the construction industry, was founded in 2016 and is headquartered in Atlanta.  The company introduced its SmartPM product in mid-2019 and is the only cloud-based, schedule analytics software solution designed specifically for the construction industry. Founded by industry analytics experts, the company introduced the first full-service project analytics system that extracts information from native schedule files and converts it into meaningful insights, which helps minimize risk of cost exposure related to delays and overruns. SmartPM was designed by construction professionals with one mission in mind: to provide stakeholders with the tools necessary to effectively control costs and schedules, and to keep projects off the path toward disputes.

Previous Post: SmartPM at the Associated General Contractors of America’s AGC Convention 2021
SmartPM at the Associated General Contractors of America’s AGC Convention 2021

SmartPM at the Associated General Contractors of America’s AGC Convention 2021

Next Post: AXA XL Launches Contractor Schedule Benchmarking with SmartPM
AXA XL Launches Contractor Schedule Benchmarking with SmartPM

AXA XL Launches Contractor Schedule Benchmarking with SmartPM

Related Stories