Dunwoody, GA – Hybrid
The SmartPM Schedule Control Platform is a game changer in the construction project management landscape. We are a fast growing, forward-thinking company that provides cutting-edge project management and analytics solutions. We aim to empower construction professionals and project stakeholders with the tools to achieve unprecedented efficiency, transparency, and project success.
SmartPM is looking for an experienced and motivated Senior Backend Engineer to join our team to help build and maintain our code base. You will be instrumental in developing, and maintaining the robust backend infrastructure that powers our SaaS solutions. You’ll collaborate closely with team members to ensure the seamless integration of back-end components, optimize performance, and deliver a scalable and secure SaaS platform.
This position will report to the VP of Engineering and will be located in Atlanta, GA.
This is an exceptional opportunity to be part of a high-growth technology company with a supportive and energizing culture. At SmartPM, we are dedicated to our collective growth, development, and success. If you’re prepared to be an integral member of our team as a Senior Backend Engineer, we invite you to apply.
Learn about our applicant and candidate privacy policy and about creating a profile on My Settings.
Learn how SmartPM can help: Book a Demo or call 404.329.3000
53 Perimeter Center East, Suite 450 Atlanta, GA 30346
Copyright 2024 SmartPM Technologies, Inc. All rights reserved.