Schedule Comparison Tool

Schedule Version Comparison
Made Easy

Instantly compare any two schedule updates to see what changed, where, and why. SmartPM highlights the differences in logic, dates, durations, and critical paths – so you can understand every shift before it becomes a problem.

Trusted by Leading Contractors, Owners, and Consultants

What it Does

Visualize Change With Clarity

The Schedule Comparison Tool lets you overlay two schedule versions – baseline vs. current, or any two updates – and see exactly what’s different.

  • Critical and near-critical changes
  • Added and deleted activities
  • Logic and sequence changes
  • Calendar and duration changes

No more guesswork. The visual comparison makes it easy to isolate where the plan diverged from reality without manually exporting or color-coding required.

Line and bar chart titled “Schedule Changes Over Time” showing increases in critical, near-critical, and duration changes from January to April.
changes-over-timeb

Understand the Story Behind Every Update

Project schedule changes happen constantly, but few teams take time to analyze them. SmartPM automates the review so you can:

  • Detect manipulation, risk, or data entry errors
  • Verify that updates align with reality
  • Catch scope changes and re-sequencing early
  • Maintain transparency with stakeholders
  • Support forensic analysis and TIA preparation

Key Features

See exactly what moved your project and what to do next

SmartPM change analysis view showing an activity changes table and a schedule changes over time chart.
SmartPM change analysis tables showing near-critical changes and critical changes across schedule updates.
SmartPM logic changes table showing updated and added schedule logic relationships.
Exported change summary spreadsheet listing schedule differences, with the 'Critical Changes' worksheet selected.
SmartPM change analysis view showing an activity changes table and a schedule changes over time chart.
Take their word for it

“If your company wants to leverage data-driven, decision-making processes, and needs true insights into what’s really happening with the schedules on their projects, SmartPM is the product I would recommend.”

Denton Perreault (DesCor Builders)
Denton Perreault DesCor Builders
Take their word for it

“Incredible Schedule Analytics Tool. SmartPM is super easy to learn and very effective when trying to communicate what is going on in the schedule. It is so quick and easy to upload your schedules into the software and within minutes have all of the metrics at your fingertips.”

Brandon Howell (Layton)
Brandon Howell Layton
Take their word for it

“Some metrics we looked at in the past were lagging indicators. SmartPM provides leading indicators that give us time to adjust early and with more confidence.”

Take their word for it

“SmartPM did everything we needed it to do and more. It allows us to identify potential roadblocks in our schedule – and do it early enough to remediate the issues.”

Take their word for it

“Information to our owners is now 10X greater than before we had SmartPM. We uncovered a lot of risks that we did not know we had."

Shane Tresch (Bell Construction)
Shane Tresch Bell Construction
Take their word for it
“The dashboard is easy at a glance. You can see health, compression, and the real end date in a single view.”​​
Take their word for it
“The Windows Analysis is a game changer. What used to take me weeks or months on some projects now takes minutes or hours. I don't want to analyze any project without SmartPM anymore.”
Take their word for it
“SmartPM’s interface was superior versus the competition, with essential metrics and reports clearly displayed and easy to find.”
Rob McMurrich (J.H. Findorff)
Rob McMurrich J.H. Findorff
Take their word for it
“SmartPM is really helping us find and deal with the flaws in our baseline schedules and weekly updated schedules. It is saving us a lot of time by providing a cheat sheet on any issues with the schedule and points us right to the issue at hand instead of having to go dig for it.”
Brandon Schroer (DesCor Builders)
Brandon Schroer DesCor Builders
Take their word for it

“The integration between SmartPM and Procore is huge for us because we don’t have to reinvent the wheel. We just add SmartPM into our current process to supplement it rather than change it.”

Take their word for it
“Our investors want to be assured they’re going to receive a certain return on a project. Achieving that return means that we need to hit both the budget and the schedule. SmartPM helps us reach both on virtually every project, which has ultimately translated to a history of solid returns that make our investors more comfortable."
Nicholas Pasquenza LCOR