Michael Pink to Speak at 2019 IRMI Construction Risk Conference

Michael Pink will present “A Data-Driven Approach to Reducing Overruns and Delays” at IRMI 2019.

ATLANTA, Nov. 05, 2019 – (GlobeNewswire) – SmartPM Technologies, a leading provider of Automated Project Analytics Software for the Construction Industry, announced today that Michael Pink, CEO of SmartPM Technologies, will be speaking at the International Risk Management Institute 2019 IRMI Construction Risk Conference (CRC). Pink will be speaking on the topic of using automated data analytics to improve Construction project performance and reduce project delays and cost overruns.

According to Pink:

“While there are many tools in the construction industry designed to track tasks and timelines, none have solved the industry epidemic of project delays and cost overruns. In fact, 75% of commercial construction projects are still significantly delayed, with an average overrun of 10%, costing stakeholders well over a Trillion dollars annually.”

Pink goes on to say, “I believe this problem can be solved with automated project analytics, which are absolutely critical to risk management in the Construction industry. I look forward to sharing my thoughts on this important topic with the IRMI community.”

 

For more information about 2019 IRMI, CRC, or to see the full line up of speakers:

Visit: https://www.irmi.com/conferences/construction-risk-conference.

 

About SmartPM Technologies

 

SmartPM Technologies Inc., a leading project analytics company for the construction industry, was founded in 2016 and is headquartered in Atlanta.  The company introduced its SmartPM product in mid-2019 and is the only cloud-based, schedule analytics software solution designed specifically for the construction industry. Founded by industry analytics experts, the company introduced the first full-service project analytics system that extracts information from native schedule files and converts it into meaningful insights, which helps minimize risk of cost exposure related to delays and overruns. SmartPM was designed by construction professionals with one mission in mind: to provide stakeholders with the tools necessary to effectively control costs and schedules, and to keep projects off the path toward disputes. For more information, visit smartpm.com.

Related Stories

Join our webinar

Invest in Continuous Improvement

Name(Required)
By clicking "Submit", I agree to SmartPM's Terms of Service and Privacy Policy.